For problems 31 through 50, choose the best response.  Place the letter of the response you choose in the space to the right of the number (1 point each).  | 
31. The drain rock must be separated from the backfill material by:  | 
|  A. Newspaper |  B. Straw |  C. Untreated building paper | 
|  D. Non-woven geotextile fabric |  E. Cardboard |   | 
32. The best use of the land over a drainfield would be:  | 
|  A. A Livestock Corral |  B. A Lawn |  C. A Parking Area | 
|  D. A Garden |  E. An Orchard |   | 
33. Which of the following is not required of septic tanks:  | 
|  A. Risers to surface grade |  B. Secured to prevent unauthorized entry |  C. 50' from a single family well | 
|  D. Watertight |  E. All are required of septic tanks |   | 
34. Where can you find the required trench depth of the drainlines:  | 
|  A. Your Septic Permit |  B. BFHD Board of Health Rules and Regs No.2 |  C. Drainfield cross-section sheet | 
|  D. Trench depth is a standard known depth of 36 inches |  E. Both A and C |   | 
35. Distribution boxes must be:  | 
|  A. Level |  B. Watertight |  C. Set up to provide equal distribution | 
|  D. All of the above |   |   | 
36. Gravelless chambers do not require:  | 
|  A. Filter fabric over the chambers |  B. One observation port per lateral |  C. Splash plates to avoid erosion when entering chamber | 
|  D. Raking the trench bottom |  E. Level Trenches |   | 
37. For a system requiring three 90’ laterals, equal distribution should be accomplished using:  | 
|  A. Four-inch PVC tees |  B. A plastic drop box |  C. Step-downs | 
|  D. A distribution box |  E. A serial network |   | 
38. When abandoning and installing a new septic tank, the following action is not required:  | 
|  A. Have the tank pumped |  B. Excavate and remove the failed tank |  C. Remove or destroy lid | 
|  D. Permit for new tank |  E. Backfill with soil |   | 
39. The reserve area of a septic system drainfield:  | 
|  A. Must be 75% of the active drainfield |  B. Can be used for shop/garage construction |  C. Allows for a space to drill a well | 
|  D. Should be used to drain snowmelt away from the system |  E. Allows for repair when a system fails |   | 
40. The slope on the last ___feet before the tank must not be more than ¼” per foot.   | 
|  A. 2 |  B. 4 |   | 
|  C. 5 |  D. 10 |   | 
41. The minimum pipe rating required in Benton and Franklin Counties for septic tank inlet and outlet lines is:  | 
|  A. Schedule 40 PVC |  B. 4" ABS or PVC 1000 lb crush strength |  C. 4" ABS or PVC 4000 lb crush strength | 
|  D. ASTM D1785 |  E. ABS 1210 |   | 
42. Minimum slope is ____per foot from the house to the tank (plumber’s grade).   | 
|  A. 1/8" |  B. 1/4" |   | 
|  B. 1/5" |  D. 1/3" |   | 
43. To request a final inspection of your drainfield installation you must:  | 
|  A. Call the environmental Health front desk |  B. Submit the request on our website |  C. Call your inspector to see when they are available | 
44. The minimum pipe rating required in Benton and Franklin Counties for drainfield lines:   | 
|  A. Schedule 40 PVC |  B. 4" PVC, perforated pipe 1000 lb crush strength |  C. 4" ABS or PVC 4000 lb crush strength | 
|  D. ASTM D1785 |  E. ABS 1210 |   | 
45. Drainfield trenches must meet all of the following except:  | 
|  A. Installed in original, undisturbed soil |  B. No deeper than specified on the permit |  C. Separated by 10 foot on center | 
|  D. Pipe fitting joints must be glued |  E. Sloped - no more than 2 inches of drop per 100 feet |   | 
46. From the D-box outlet to the start of perforated pipe and/or chambers, you must have ____feet of solid pipe.  | 
|  A. 1 |  B. 5 |   | 
|  C. 10 |  D. 3 |   | 
47. Pipe and gravel drainfields require all of the following except:  | 
|  A. At least 6" of drainrock in the bottom of the trench |  B. A minimum drainrock depth of 12" |  C. Perforated pipe drain holes oriented at 10 and 2 o'clock | 
|  D. Observation ports on the ends of laterals |  E. Non-woven geotextile filter fabric separating drainrock and backfill |   | 
48. Maximum allowable backfill soil depth over drainfield trenches is:  | 
|  A. 6-12" |  B. 12-24" |   | 
|  C. 24" |  D.12-18" |   | 
49. At final inspection the system must:  | 
|  A. Have all components installed, tank properly bedded with top exposed, lids secured, and no part of the install backfilled. |  B. Have D-Box level and brought to surface grade | 
|  C. Have any sleeving exposed |  D. All of the above |   | 
50. If a problem is encountered during install, you should do the following:  | 
|  A. Note it on your inspection request submittal |  B. Stop work and call the Health District for further information | 
|  C. Mention the issue you encountered with the inspector when they are out for inspection |  D. Proceed with the best option |